2026 Production Calendar

Production Availability

Plan ahead, produce on time. See our current production capacity and book your slot. We publish this page to help brands plan their collections around real factory timelines — no guesswork, no surprises.

Factory Status

Accepting Orders

4–6 Weeks

Current lead time

June 2026

Next production slot

Open Now

Sampling availability

Planning Timeline

Seasonal Production Calendar

Use this calendar to plan your collection around our production schedule. Order-by dates ensure your garments are manufactured and delivered in time for your launch.

SeasonCollectionOrder ByProductionDelivery
SS27Spring/Summer 2027Aug–Oct 2026Oct–Dec 2026Jan–Feb 2027
AW27Autumn/Winter 2027Jan–Mar 2027Mar–May 2027Jun–Jul 2027
Ramadan 2027Capsule collectionNov–Dec 2026Jan 2027Feb 2027
Holiday 2026Gift / seasonal dropsJul–Aug 2026Sep–Oct 2026Nov 2026

3 Steps

How to Secure Your Slot

01

Submit Your Project

Share your tech pack, sketches, or reference images through our order request form. Tell us about quantities, fabrics, and decoration. We respond with a detailed quotation within 48 hours.

Start your project
02

Approve Your Sample

We produce a physical sample for your review. You check fit, fabric, colour, and decoration quality. Adjustments are included until the sample matches your vision. Sampling typically takes 1–2 weeks.

03

Confirm Production

Once your sample is approved, confirm your production slot with a 50% deposit. We schedule your order on the production floor and provide a delivery timeline. You receive updates throughout the process.

Important Notice

Peak Season Advisory

August–November is our busiest period. Holiday collections and Autumn/Winter production fill our factory floor, and lead times can extend by 2–3 weeks during this window.

Brands planning for Q4 should submit sample requests by July to guarantee their production window. Late submissions may be pushed to the next available slot in December or January.

The earlier you start sampling, the more control you have over your timeline.

Common Questions

Frequently Asked Questions

Can I book a production slot without a sample?

No — sample approval is required before we schedule bulk production. This protects both sides: you confirm fit, fabric, and decoration quality before committing, and we ensure the production spec is locked before allocating factory time. You can submit your project at any time and we will begin sampling immediately.

What happens if I miss my production window?

If your slot passes without a confirmed order, we move you to the next available production window. During peak season (August–November), the next opening may be 4–6 weeks later. We always notify you in advance if your window is approaching so you have time to confirm.

How far in advance should I plan my production?

We recommend a minimum of 8–10 weeks from first contact to delivery. This includes 1–2 weeks for sampling, 4–6 weeks for production, and shipping time. During peak season, plan 12 or more weeks ahead. The earlier you submit your project, the more flexibility you have with scheduling.

Do you offer rush production?

Yes, rush production is available subject to current factory capacity. Rush orders are prioritised on the production floor and can reduce lead times by 1–2 weeks. A rush fee may apply depending on the order size and turnaround required. Contact us to check current availability.

Ready to Book Your Production Slot?

Submit your project today. Quotation within 48 hours.